What this category's data looks like
This page focuses on three types of materials in kindergarten childcare daily life management: the daily life schedule, morning and afternoon check records, and child health observation records. The daily life schedule is updated weekly or monthly, with fields including activity name, start and end time, and responsible person's signature; morning and afternoon check records are filled in daily, with fields including child's name, morning check time, body temperature, abnormality description, and teacher's signature; child health observation records are generated per occurrence, with fields including observation date, behavior description, handling measures, and parent receipt. The three types of materials play different roles when entering the workflow: the schedule provides the time framework and responsibility division, morning and afternoon check records provide the day's health screening results, and observation records provide individual tracking and parent feedback. In terms of update rhythm, the schedule is version-changed at the beginning of the semester or when adjusted, morning and afternoon check records are added daily, and observation records are triggered by events. In terms of field characteristics, date, name, quantity, and signature are the key anchors for cross-material alignment, and are also the basis for whether subsequent basis entries can refer back to the original text.
Configuration and implementation checks
This link is executed by workflow nodes (user selection and branches), outputting branch direction and interaction status records. Basis entries that can refer back to the original text are completed by subsequent nodes continuing execution according to the branch. Nodes only output branch direction and interaction status records; the business finished product is completed by subsequent nodes continuing execution according to the branch.
| Object | Check | Verification action |
|---|---|---|
| Daily life schedule | Whether the activity name, start and end time, responsible person's signature, and current version date are consistent with the current semester | Check the options and branch connections one by one in the node, and confirm that the schedule version branch points to the current material |
| Morning and afternoon check records | Whether the child's name, morning check time, body temperature, abnormality description, and teacher's signature are complete day by day and the dates are continuous | Trigger one user selection, view the node status in the run record, and check the branch direction of the morning and afternoon check records |
| Child health observation records | Whether the observation date, behavior description, handling measures, and parent receipt match the same child on the same day in the morning and afternoon check records | Reference the selection result variable in a subsequent node and run a trial once, and check whether the reference of the observation record branch takes effect |
| User selection node | Each option corresponds to one branch, and the selection result variable has been passed to subsequent nodes | Reference this variable in a subsequent node and run a trial, and confirm that after the interaction is completed the process continues according to the selected branch |
Three common errors
- Phenomenon: The same child's name is written differently in the morning and afternoon check records and the health observation records, and the dates also do not match. Cause: The two materials are entered separately, and cross-material alignment has not been done using the schedule date as the anchor.
- Phenomenon: The daily life schedule has already changed versions, but the morning and afternoon check records are still filled in according to the old version's activities. Cause: The versions are not synchronized, the old version material has not been marked as discontinued, and the branch still points to the old version.
- Phenomenon: The health observation records have handling measures but lack the parent receipt, and the morning and afternoon check records lack the teacher's signature. Cause: The signature and receipt steps have not been included in the material completeness check, and missing items have not been discovered.
How to verify the setup
This function's acceptance: run trials option by option, check the branch direction and interaction status in the run record, confirm that each option corresponds to one branch, and that the selection result variable has been passed to subsequent nodes.
Business test: ask a cross-material basis question, see whether the answer gives a referenceable source, and check whether the basis entries can match the original text of the daily life schedule, morning and afternoon check records, and child health observation records.
- Check the options and branch connections one by one in the node, confirm that each option corresponds to one branch, and use
variablesto reference the selection result variable and run a trial once. - Trigger one user selection, view the node status and
nodeIdin the run record, and confirm that after the interaction is completed the process continues according to the selected branch, without stopping or repeatedly entering the interaction.