What the data for this category looks like
Data sources include monthly operational data released by the National Textile Industry Federation, quarterly financial reports of listed textile enterprises, raw material spot quotes from commodity exchanges, and production scheduling and quality inspection documents from factories. Raw material quotes are updated daily. Industry monthly data is released 7 days behind schedule. Financial reports are updated quarterly. Most documents are tabular, such as production capacity, inventory and cost details. Others are long-form text, such as industry analysis reports. Some include production flowcharts and quality inspection photos. Professional fields include units such as yarn count, gram weight and grey fabric width.
What constraints these characteristics impose on deployment and upgrade
The high-frequency updated raw material quotes require configuring an incremental synchronization mechanism during deployment. This avoids wasting computing resources on full scans. Multi-type documents, including tables, long text and images, require compatible multimodal parsing modules during upgrades. This meets the recognition needs of quality inspection photos. Professional fields and units require pre-configuring a custom terminology dictionary. This prevents general parsing models from misidentifying units. Long-text financial reports and industry reports require adjusting the context window parameter. This prevents key data from being truncated. The incremental update frequency must align with the release cadence of each data source. This ensures the timeliness and update consistency of investment research data.
How to set the configurations
| Configuration Item | Recommended Setting | Rationale |
|---|---|---|
UPLOAD_FILE_MAX_SIZE | 2000 MB | Adapts to the file size requirements of large financial reports and industry reports in the textile manufacturing field |
PARSE_FILE_TIMEOUT_SECONDS | 600 seconds | Meets the parsing time requirements for long-text financial reports and industry reports with multiple charts |
enable_multi_modal_parse | Enabled | Adapts to the parsing of textile work order documents that include production flowcharts and quality inspection photos |
custom_terminology_dict | Upload the textile industry professional terminology list | Prevents general parsing models from misidentifying professional units such as yarn count and gram weight |
incremental_sync_interval | 86400 seconds | Matches the daily update cadence of raw material quote data sources, while balancing resource usage |
max_context_length | 12000 characters | Adapts to the content length of long-form industry analysis reports and quarterly financial reports |
The parameter values provided on this page are common starting points for configuration. Actual values are affected by material form, data volume and business rules. Specific issues require specific analysis. It is recommended to test on your own samples before finalizing.
Three common mistakes
- Phenomenon: After local deployment, the image understanding model option is empty when creating a general knowledge base. Cause: The multimodal parsing module is not enabled in the deployment configuration, or the corresponding model dependency package is not loaded.
- Phenomenon: After locally deploying the MCP Server, a
500 Internal Server Erroris returned during calls. The log shows that the proxy endpoint cannot be connected. Cause: Themcpserverproxyendpointconfiguration item is filled incorrectly. The correct local port is not specified, or the proxy service is not enabled. - Phenomenon: A
408 Request Timeouterror occurs when parsing large textile quarterly financial reports. Cause: ThePARSE_FILE_TIMEOUT_SECONDSconfiguration value is set too small. It does not adapt to the parsing time of long documents.
How to confirm the configuration is correctly set
- Upload a single textile industry report that matches the size of industry documents. Check whether the upload and parsing process completes normally. Confirm that the
UPLOAD_FILE_MAX_SIZEconfiguration meets actual needs. - Upload a textile work order document that includes quality inspection photos. Check whether text and annotations in the images are successfully extracted. Confirm that the multimodal parsing module is enabled normally.
- Configure an incremental synchronization task. Check the synchronization log. Confirm that the synchronization frequency aligns with the data source release cadence. Confirm that the
incremental_sync_intervalconfiguration is reasonable. - Fill the listening port of the local MCP Server into
mcpserverproxyendpoint. Initiate a test call. Confirm that the connection status is normal.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.