What Data for This Category Looks Like
Construction and decoration investment research data mainly comes from industry specifications and standards, public parameters of building material manufacturers, construction technology manuals, ongoing or completed project archives, and cost quota documents. The update rhythm is inconsistent: building material prices are updated monthly, industry specifications are revised quarterly or annually, and project cases are added as needed. Single documents include category identifiers, core parameters, compliance requirements, and associated drawing numbers. Fields cover brand, model, environmental protection rating, unit price, and acceptance threshold, with common units including square meters, meters, sets, yuan per square meter, days, and similar units.
Constraints on Conversation Logs and Auditing
The multiple sources, inconsistent update rhythms, and complex field structure of construction and decoration investment research data create multiple constraints for the conversation logs and auditing process. First, single documents contain multi-dimensional parameters. Logs must fully record the specific fields and associated numbers of each recalled document to avoid inability to trace compliance basis during audits. Second, building material prices and industry specifications have different update cycles. Logs must retain document version identifiers to ensure the data source version used during historical calls can be traced back. Third, project-associated drawings must be bound to unique numbers. Logs must synchronously record drawing call links to support full-process auditing. Finally, investment research conversations often involve verification of multiple material combinations. Logs must fully retain all recalled associated documents to avoid missing key compliance items.
Configuration Settings
| Configuration Key | Recommended Value | Rationale |
|---|---|---|
Conversation Log Storage Duration | 180 days | Compliance audits in the construction industry usually require retaining at least six months of business records to meet standard audit cycles |
Recalled Document Field Record Scope | Full fields + version identifier | Construction investment research data includes multi-dimensional parameters and associated numbers. Full field recording can cover the traceability requirements of compliance audits |
Log Audit Trigger Condition | Automatically triggered after each conversation ends | Construction investment research involves compliance verification. Complete conversations and call links must be retained in real time to facilitate post-event auditing |
Document Version Record Switch | Enabled | The update rhythm of construction data is inconsistent. Version identifiers must be used to distinguish data sources from different cycles to ensure audit traceability |
MongoDB Log Shard Threshold | 10000 entries/shard | Construction investment research conversation logs have large data volume. Sharded storage ensures query efficiency and avoids query delays during audits |
The parameter values provided on this page are all conventional recommendations used as a starting point for configuration. Actual values are affected by material forms, data volume, and business rules. Specific issues require specific analysis. It is recommended to test on your own samples before finalizing.
Three Common Misconfigurations
- Phenomenon: The conversation details page only displays interactive text between users and AI, and cannot view detailed records of internal document recalls or parameter verification. Cause: The full field configuration for
Recalled Document Field Record Scopeis not enabled, and only basic interactive text is stored. - Phenomenon: There is no conversation history data in the corresponding MongoDB log collection. Cause:
Conversation Log Storage Durationis not configured, or is set to0 days, causing logs to be automatically cleared, or the log writing switch is not enabled. - Phenomenon: Document versions and associated drawing numbers are not recorded in conversation logs, making it impossible to trace data sources and project associated information from historical calls. Cause: The
Document Version Record Switchis not enabled, so key identifier fields are not retained in logs, failing to meet compliance audit requirements for construction investment research.
How to Confirm Configuration Is Complete
- Enter the application conversation history page, randomly select a historical conversation, click to view details, and confirm that the page includes document recall fields, version identifiers, and associated drawing numbers.
- Log in to the MongoDB management backend, query the corresponding log collection, and confirm that there are conversation records from the past 7 days, and each record contains complete call parameters.
- Trigger an investment research conversation involving multiple material combinations, wait for the conversation to end, and check the audit log to confirm that the automatic auditing process is triggered.
- Modify the configuration of
Document Version Record Switch, initiate a conversation again, and confirm that the document version field is added to the log.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.