What this category's data looks like
Data for packaging and printing market conditions and yield rates comes from internal enterprise production management systems, regional raw material spot trading platforms, and public production and operation data released by industry associations. The update rhythm syncs full data from the previous workday each day, generating that day's market and yield rate daily report. Documents use a structured table format, with fields including production batch ID, raw material category, purchase unit price, unit printing consumable cost, finished product shipping unit price, and unit output profit amount. Field units match actual category requirements: raw material prices are priced per weight unit, and finished product prices are priced per printing area unit.
What constraints these characteristics impose on model access and configuration
For multi-source data access scenarios, configure validation rules for multi-source data to only include valid data updated on the current day, and avoid old data interfering with model output. For the fixed daily update rhythm, configure scheduled sync trigger parameters to ensure the model always obtains the latest market and yield rate information when called. For unit differences across structured fields, configure field mapping and unit unification rules to standardize raw material and finished product prices from different sources to the category's common pricing units, avoiding unit confusion during model recognition. For the fixed daily report document structure, configure a document parsing field extraction template to accurately extract target fields and reduce irrelevant content polluting the knowledge base.
How to set the configuration
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
SYNC_CRON | 0 2 * * * | Matches the packaging and printing daily report generation and update rhythm, ensures the latest data from the previous workday is synced each early morning |
DATA_EXPIRE_HOURS | 24 hours | Only retains valid data from the past 24 hours, avoiding expired historical market data interfering with model output |
PARSE_FILE_TIMEOUT_SECONDS | 600 seconds | Adapts to the packaging and printing daily report document parsing requirements, reserves sufficient time to extract all structured fields |
| Field Mapping Rules | Align with packaging and printing common field names | Standardizes field identifiers across multi-source data, ensuring the model can recognize unified yield rate-related information |
RECALL_COUNT | Top 3 entries | Covers core category market and yield rate data from packaging and printing daily reports, avoids redundant information |
SIMILARITY_THRESHOLD | 0.75 | Filters duplicate raw material price records, retains core data related to yield rate calculations |
The parameter values provided on this page are common starting points for configuration. Actual values are affected by material form, data volume and business rules. Specific issues require targeted analysis. It is recommended to test on your own samples before finalizing settings.
Three Common Configuration Errors
- Phenomenon: The knowledge base page displays all imported daily report documents, but the model prompts that no available data exists during conversation. Cause: The
SYNC_CRONorDATA_EXPIRE_HOURSparameters are not configured, resulting in unfiltered old imported data, or the scheduled sync task does not trigger normally. The model cannot obtain valid data when called. - Phenomenon: Calling the MCP tool to obtain packaging and printing market data returns a 400 status code. Cause: Field mapping and unit unification rules are not configured. The incoming request parameters contain units that do not match the category or misaligned field names, causing tool call verification to fail.
- Phenomenon: When configuring document parsing rules, a timeout error prompt pops up after saving. Cause: The set
PARSE_FILE_TIMEOUT_SECONDSparameter value is too small, failing to complete full field parsing of the packaging and printing daily report, causing the parsing process to time out.
How to Confirm Successful Configuration
- Manually trigger the configured scheduled sync task, check if the update time of documents in the knowledge base matches the previous workday, confirming the sync process is running normally.
- Initiate a model call request, verify that the field names and units of the returned market and yield rate information align with the configured mapping rules.
- View tool call logs, confirm there are no format or field mismatch errors in the MCP tool request parameters, ensuring the verification logic takes effect.
- Adjust the recall count or similarity threshold configuration, verify that the number of model return results and filtering effects meet business requirements.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.