Document Parsing and Chunking for Power Industry Intelligent Due Diligence Reports

Data sources for power industry intelligent due diligence reports include power project feasibility study reports, grid connection acceptance

Data Characteristics of This Category

Data sources for power industry intelligent due diligence reports include power project feasibility study reports, grid connection acceptance opinions, operation and maintenance logs, electricity price approval documents, power grid dispatching data, and others. Update cycles fall into two categories: one-time static documents and periodic dynamic documents. Static documents such as feasibility study reports and grid connection files are updated only when a project is approved or commissioned. Dynamic documents such as monthly operation logs and quarterly electricity price adjustment files are updated on fixed schedules. Document structures typically include sections such as project overview, installation parameters, financial calculations, grid connection conditions, and environmental emissions. Fields include professional parameters like installed capacity, power generation, and electricity price. Some documents are scanned stamped files.

Constraints Imposed on Document Parsing and Chunking

Diverse data sources and the presence of scanned documents require the parsing workflow to support multiple formats including PDF, Excel, and scanned files. OCR must be enabled to handle scanned documents. Differences in update cycles require the chunking workflow to differentiate between static and dynamic content. This prevents applying inconsistent chunking rules to periodically updated logs and one-time feasibility study documents. Fixed units for professional parameters require retaining contextual associations between parameters and their units during chunking. This avoids separating parameters from their units after splitting. Complex document hierarchies require chunking to follow section hierarchies. This prevents splicing unrelated power industry professional content across sections.

How to Set Configurations

Configuration ItemRecommended SettingRationale
UPLOAD_FILE_MAX_SIZE1000 MBAccommodates multi-page PDFs and large Excel logs commonly included in power due diligence reports, prevents interruptions during large file uploads
PARSE_FILE_TIMEOUT_SECONDS900 secondsPower documents often contain large numbers of tables and long text passages, extending timeout prevents parsing interruptions
chunk_size800–1200 charactersMatches the average length of technical parameter sections and financial calculation sections in power documents, retains complete parameter associations
chunk_overlap100–150 charactersPrevents splitting cross-page power equipment parameters and electricity price calculation formulas, retains contextual associations
PARSE_SCAN_PDF_ENABLEEnabledSome power grid connection acceptance documents are scanned PDFs, enabling OCR parsing extracts editable text
MAX_PARSE_PAGE_NUMCalibrated via actual testingAccommodates scenarios where a single due diligence report may exceed 500 pages, prevents exhaustion of parsing resources

The parameter values provided on this page are common recommended starting points for configuration setup. Actual values are influenced by material format, data volume, and business rules. Specific issues require targeted analysis. It is recommended to test on your own samples before finalizing settings.

Three Common Mistakes

  • Uploading a large power due diligence report reaches 90% progress and displays an "offset out of range" error. The cause is failure to adjust UPLOAD_FILE_MAX_SIZE and backend chunked upload buffer configurations, resulting in data truncation during large file chunked transmission.
  • Files uploaded using the create file collection API have inconsistent chunking results with files uploaded directly via the platform frontend. The cause is failure to explicitly specify chunk_size and chunk_overlap parameters during API calls, leading to a mismatch between default configurations and custom settings used for frontend uploads.
  • Some technical parameter fields are empty after parsing scanned power grid connection acceptance documents. The cause is failure to enable PARSE_SCAN_PDF_ENABLE, which does not trigger OCR extraction of scanned text.

How to Verify Correct Configuration

  • Upload a single power due diligence report matching the maximum business volume, confirm the upload process has no interruptions or errors.
  • Call the create file collection API and upload the same power document via the platform frontend, verify that the start and end positions of chunks are consistent.
  • Parse a scanned power due diligence document, confirm that the extracted text includes professional parameters and unit information.