What the data for this category looks like
Teams building power grid equipment intelligent due diligence reports for finance, insurance, and wealth management sectors draw data from three sources: manufacturer factory inspection documents, patrol logs from power grid operation and maintenance platforms, and compliance filing documents from power regulatory authorities. Data update rhythms vary: factory core parameters are static, updated only with device model iterations. Operation and maintenance patrol records update monthly or quarterly. Compliance filing documents adjust to match regulatory requirements. Typical document structures include modules for device model, core parameter groups, previous operation records, defect ledgers, and compliance check items. Fields and units follow clear specifications: rated voltage uses kV, rated capacity uses MVA, insulation resistance uses MΩ, and patrol cycle uses days.
Constraints for Multi-turn Dialogue and Prompt Engineering
The differing update rhythms of static parameters and dynamic operation and maintenance data require multi-turn dialogue to clearly distinguish query types. Prompts must specify data time ranges to avoid retrieving outdated information. Complex document structures and large numbers of fields mean prompts must define parameter extraction priorities and field rules explicitly, preventing confusion between different parameter groups. Standardized field units require prompts to pre-configure unit conversion logic, ensuring returned results use consistent units. Multi-turn dialogue must retain historical query device identifiers to avoid incorrect parameter references across devices.
Configuration Settings
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
maxContext | 8000–12000 characters | Power grid equipment due diligence reports contain multiple sets of parameters and operation records. A sufficient context window prevents loss of parameter references during multi-turn dialogue |
chunkSize | 1000–1500 characters | Parameter paragraphs in individual equipment due diligence documents are typically long. This chunk length preserves the integrity of parameter groups while ensuring retrieval accuracy |
similarityThreshold | 0.78–0.85 | Naming rules for power grid equipment parameter fields are consistent. A higher threshold filters duplicate or irrelevant retrieval results |
recallCount | Top 6–9 results | Core fields in individual due diligence reports are numerous. A sufficient recall volume covers all critical query needs |
dialogMaxTurns | 12–16 turns | Multi-turn dialogue for power grid equipment due diligence typically focuses on parameter verification and defect tracking. This turn count balances context completeness and redundancy |
systemPrompt | Pre-set compliance and parameter extraction rules by device category | Power grid equipment must comply with power regulatory standards. Pre-set prompts clarify the priority of parameter extraction and compliance judgment |
The parameter values provided on this page are general recommendations used as a starting point for configuration. Actual values are affected by material format, data volume, and business rules. Specific issues require targeted analysis, and it is recommended to test on your own samples before finalizing settings.
Three Common Misconfigurations
- Phenomenon: When configuring a form input node in a single workflow, the dialogue popup automatically hides. When nested within another workflow, the dialogue popup displays normally. Cause: The context transfer logic during workflow nesting does not cover the trigger conditions of the form node, resulting in the popup state not being reset correctly.
- Phenomenon: When attempting to embed web content or custom styles in the dialogue popup, only plain text is displayed, and the expected polished layout cannot be rendered. Cause: The default dialogue component does not enable custom content parsing permissions. Adjust the content rendering configuration of the popup.
- Phenomenon: After upgrading to version 4.9.10, only 2 optional configuration items remain for global variable and prompt input boxes, which does not match the rich options available in version 4.8.10. Cause: The classification logic for configuration items was adjusted during version iteration. Re-enable the extended configuration panel in system settings.
How to Verify Proper Configuration
- Initiate a query for core parameters of power grid equipment, verify the field completeness and unit consistency of returned results, and adjust relevant configuration items until the results meet expectations.
- Simulate a multi-step due diligence query process, verify that historical dialogue context is correctly retained, and adjust the context window and dialogue turn configuration to meet requirements.
- Import a single standard power grid equipment due diligence document, test the content chunking effect after document parsing, and adjust the chunk length configuration until parameter groups are not split unreasonably.
- Check the configuration content of the system prompt, confirm that it includes parameter extraction and compliance judgment rules for the power grid equipment category, and adjust the prompt until it meets business requirements.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.