Power grid equipment research report sources include public reports from power industry research institutions, operation and maintenance documents from grid enterprises, technical white papers from equipment manufacturers, and industry policy interpretation documents. Updates are triggered by industry events. Quarterly market analysis reports are updated after the end of each quarter. Supplementary updates are released within 1 to 3 days after new product launches or policy announcements. Document structure includes four parts: project overview, equipment parameter module, market supply and demand analysis, and operation specifications. Core fields include equipment model, rated voltage (unit: kV), rated current (unit: A), insulation grade, service life (unit: year), and other items. Some documents include test data tables and technical drawings.
What Constraints These Characteristics Impose on Deployment and Upgrade
Multi-source and scattered data sources require configuring multi-path batch upload and cross-source data aggregation rules during deployment to avoid data omissions. Irregular emergency update requirements require deploying manually triggerable upgrade interfaces, paired with scheduled tasks to implement routine updates. Long documents and multi-specialty field structures require increasing parsing timeout thresholds and context window configurations. Otherwise, parsing interruptions or field loss may occur. Parameter fields with specific units require configuring dedicated field mapping rules. Otherwise, unit confusion or parameter identification errors may occur.
How to Set Configurations
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
UPLOAD_FILE_MAX_SIZE | 2000 MB | Standard power grid equipment research reports usually include multiple pages of technical tables and drawings, resulting in larger file sizes than general documents |
PARSE_FILE_TIMEOUT_SECONDS | 900 seconds | Structured parsing of long documents and extraction of professional fields require extended processing time |
maxContext | 8000–12000 characters | Long technical descriptions and parameter lists appear in research reports, requiring adaptation to longer context windows |
Recall count | Top 10 entries | There are many market segments in the power grid equipment sector, so more related documents need to be covered to ensure comprehensive retrieval |
Similarity threshold | 0.75–0.85 | Balance the recall precision and coverage of professional content, avoiding missing documents related to specialized parameters |
REINDEX_BATCH_SIZE | 50 documents/batch | Avoid excessive server load during batch upgrades, ensuring system stability |
The parameter values provided on this page are all common recommendations used as a starting point for configuration. Actual values are affected by material form, data volume and business rules. Specific issues require specific analysis. It is recommended to test on your own samples before finalizing.
Three Common Mistakes
- The phenomenon is that after deployment, calling the retrieval interface returns
408 Request Timeout. The cause is failure to adjust thePARSE_FILE_TIMEOUT_SECONDSparameter. Long document parsing exceeds the default timeout limit. - The phenomenon is that the original environment’s complete data cannot be restored after local deployment. The cause is that only the container image was copied, and the complete backup package including database volumes and configuration files was not exported.
- The phenomenon is that retrieval results only return a small amount of non-professional content. The cause is failure to adjust the
Similarity thresholdandRecall countfor power grid equipment’s professional fields. General retrieval logic cannot adapt to the needs of specialized market segments.
How to Verify Successful Configuration
- Upload a standard power grid equipment research report, check whether core fields such as rated voltage and rated current are correctly extracted after parsing, and verify that the field mapping rules take effect.
- Trigger a batch upgrade task, check whether the system processes documents according to the configured batch size, and there are no error logs indicating excessive server load.
- Initiate a retrieval request containing professional parameters, check whether the relevance of the returned results complies with the preset
Similarity thresholdandRecall countrules. - Export the current system’s configuration files and database backup, verify that the backup files can be normally imported into a new deployment environment.