What the data for this category looks like
Data related to electric power marketing mainly comes from electricity collection terminals, power marketing business systems, customer service tickets, and official electricity price policy documents. Electricity collection data is updated near-real-time, with the latest power usage synced every 15 minutes. Marketing activity data updates with campaign cycles, and includes fields such as delivery progress and audience tags. Policy documents are mostly in PDF or Word format, covering content such as electricity price adjustments and benefit campaign details. Data fields include unique user ID, electricity usage period, electricity consumption (unit: kilowatt-hour), payment status, activity ID, delivery channel, and more. Some fields are exclusive to electric power scenarios and have no direct equivalent in general business fields.
What constraints these characteristics impose on tool calling and plugins
Near-real-time electricity collection data requires setting reasonable timeout thresholds for tool calls, to avoid call failures caused by data synchronization delays. Business data with multiple fields and exclusive units requires plugins to support custom field mapping and unit validation, otherwise electric power-specific data cannot be correctly identified and processed. Long policy documents require plugins to support chunked parsing, otherwise content truncation or parsing failure will occur. The existence of the unique user ID field requires that tool calls must verify the completeness of required fields, otherwise accurate marketing content matching cannot be completed.
How to set the configuration
| Configuration Item | Recommended Setting | Rationale | ||
|---|---|---|---|---|
chatCompletionTimeout | 600 seconds | Electric power marketing data includes near-real-time electricity collection content, which has certain data synchronization delays, so the timeout limit needs to be extended | ||
pluginCustomFieldMap | Map according to "User ID | Electricity Usage Period | Electricity Consumption (kilowatt-hour)" | The data fields of electric power marketing differ significantly from general business fields, so custom mapping is required to match exclusive fields |
maxPluginRetries | 3 times | Real-time electricity data may have occasional call failures due to terminal offline, so setting a reasonable number of retries can ensure call success rate | ||
pluginParseChunkSize | 800–1200 characters | Electric power marketing policy documents are relatively long, and splitting them into this range can ensure parsing completeness and efficiency | ||
pluginAllowCustomUnit | Enabled | Electric power data includes exclusive units such as kilowatt-hour and person-times, so custom unit validation needs to be supported to avoid recognition errors |
The parameter values provided on this page are all conventional recommendations used as a starting point for configuration. Actual values are affected by material form, data volume and business rules. Specific issues require specific analysis, and it is recommended to conduct tests on your own samples before finalizing settings.
Three common misconfigurations
- Phenomenon: A
400 Bad Requesterror is returned when calling/api/v1/chat/completions, prompting that required fields are missing. Cause:pluginCustomFieldMapis not configured correctly, and electric power exclusive fields are not passed in the request body. - Phenomenon: The tool call returns an empty result, and the system log shows
unit not supported. Cause:pluginAllowCustomUnitis not enabled, so the kilowatt-hour unit of electric power data cannot be recognized by the plugin. - Phenomenon: A timeout error occurs after the front end calls the interface directly, and the page loads without response. Cause:
chatCompletionTimeoutis not set to a reasonable duration, and near-real-time electricity data collection does not return within the default timeout period.
How to confirm the configuration is correct
- Initiate a test call, pass test data including user ID, electricity usage period, and electricity consumption (kilowatt-hour), and check whether the interface returns correctly mapped exclusive fields configured.
- Upload a power marketing policy PDF document, check whether the plugin parsing result is split according to the
pluginParseChunkSizesetting, with no content truncation or loss. - Simulate a terminal offline scenario to initiate a call, check whether the retry mechanism of
maxPluginRetriesis triggered, and finally return valid business results. - Check the system operation logs to confirm that there are no error messages such as
unit not supportedormissing required field.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.