What the data for this category looks like
Water utility financing daily report data comes primarily from local public resource trading platforms, regular disclosure announcements of water utilities, and public documents released by industry regulators. Updates occur daily, covering public water project financing information from the same day and the last three business days. Each document has a fixed structure, including fields for project name, affiliated administrative region, financing amount, financing method, financing entity, approval date, and fund use. Financing amount units are mostly ten thousand yuan or hundred million yuan. Date fields use the YYYY-MM-DD format.
Constraints imposed by these characteristics on the multi-turn dialogue and prompt engineering link
Decentralized data sources require multi-turn dialogue to guide users to clearly specify the data scope, avoiding calls to non-public or outdated information. The daily update rhythm requires prompts to explicitly limit use to public financing data from the same day and last three business days, preventing outdated output. Fixed fields and unit requirements mean prompts must enforce that output strictly matches preset field names, and financing amounts must include corresponding units. No self-conversion or omission of units is allowed. Additionally, water utility financing uses are mostly tied to specific scenarios such as municipal pipe networks and water plant expansion. Multi-turn dialogue must gradually confirm whether users need to filter results by region, financing method, or other dimensions.
Configuration Settings
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
maxContext | 8000–12000 characters | Individual water utility financing daily report documents are mostly 500-1000 characters long. Multi-turn dialogue requires retaining 3-5 rounds of context to avoid exceeding the model's context window |
recall_count | Top 6–8 entries | Valid information entries in water utility financing daily reports are concentrated. Excessive recall leads to redundant context |
similarity_threshold | 0.75–0.85 | Low-match non-water project financing information must be filtered, while relevant announcements from the same field are retained |
PARSE_FILE_TIMEOUT_SECONDS | 600 seconds | Parsing individual water utility financing daily report documents requires processing multiple field extractions. Longer batch documents require sufficient parsing time |
enable_thought_tag_filter | Enabled | Automatically remove thought tag content from model output to avoid contaminating final results |
log_auto_cleanup_days | 7 days | Water utility financing daily report business data has strong timeliness. Conversation logs do not need to be retained for more than one week |
The parameter values provided on this page are common recommended starting points for configuration. Actual values are affected by material format, data volume, and business rules. Each scenario requires tailored analysis. It is recommended to test on your own samples before finalizing settings.
Three Common Configuration Errors
- Phenomenon: A code run node is configured in the workflow to remove thought tags. Results work normally during debugging, but thought content still appears during full workflow runs. Cause: The FastGPT built-in
enable_thought_tag_filterconfiguration item is not enabled, and the code node processing does not cover the model output link across the entire workflow. - Phenomenon: When using the qwen2.5-14b-int4 quantized model, knowledge base answers are truncated. Simple mode conversations output complete content normally. Cause: The
maxContextparameter is not adjusted to fit the quantized model's context window limits, or a reasonablechunk_lengthis not set to split long documents. - Phenomenon: Conversation logs cannot be manually deleted. Cause: The
log_allow_manual_deleteconfiguration item is not enabled, or the current operating role is not granted log deletion permissions.
How to Verify Correct Configuration
- Initiate a test dialogue with a query for water utility financing daily report fields, check if the output strictly matches preset field names and units.
- Upload batch water utility financing daily report documents, check field integrity and timeout status of parsing results, confirm parsing time does not exceed the preset configuration value.
- Trigger multi-turn dialogue, check if output content has automatically removed thought tags, verify that the configuration item is effective.
- View the conversation log management interface, confirm whether there is an operation entry for manually deleting logs, verify that permissions and configuration are correct.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.