What the data for this category looks like
Data for water treatment financing daily reports comes primarily from ecological environment department project announcements, local public resource trading platforms, and public investment and financing ledgers for the water sector. The data updates daily at midnight, syncing new water treatment-related financing projects from the previous day. Each entry includes nine core fields: project name, province/city/district location, water treatment type (municipal sewage, industrial wastewater, sludge treatment, etc.), financing amount (unit: ten thousand RMB), financing party, funding party, signing date, daily project treatment scale (unit: ten thousand tons/day), and project progress. Documents are exported in bulk as structured JSON or CSV files.
What constraints these characteristics impose on tool calling and plugin configuration
Exclusive features of water treatment financing daily reports impose clear constraints on tool calling and plugin configuration. First, fields exclusive to this data such as daily treatment scale and water treatment type require added validation rules in tool parameters, to limit value ranges and classification options and avoid confusion with general financing data. Second, data updates daily at midnight, so the plugin’s scheduled pull task must align with this rhythm, and cache validity should be set to 24 hours to avoid re-pulling old data. Third, the region field uses a three-level province-city-district structure, so tool calling must support three-level linked filtering to prevent result deviations from only fuzzy province-level matching. Additionally, financing amounts use a uniform unit of ten thousand RMB, so automatic standardization must be applied during tool returns to ensure data consistency.
Configuration settings
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
mcp_sync_interval | 86400 seconds | Matches the daily update rhythm of water treatment financing daily reports, avoids frequent pulling or delayed access to latest data |
tool_param_validate_enabled | Enabled | Validates the legality of water treatment-specific fields, ensures fields such as daily treatment scale and three-level region information meet requirements |
tool_return_unit_convert | Enabled | Uniformly converts financing data to ten thousand RMB units, avoids inconsistent units such as yuan or hundred million yuan |
workflow_multi_param_prompt | Please supplement the daily treatment scale (unit: ten thousand tons/day) and three-level province-city-district information of the water treatment project | Matches the required field requirements of water treatment financing daily reports, guides users to supplement exclusive parameters |
mcp_server_version | v0.10.0 or higher | This version fixes context interruption issues during multi-parameter calls, adapts to workflow multi-node calling requirements |
tool_call_max_retry | 2 times | Financing data has a low update frequency, avoids frequent retries that waste system resources |
The parameter values provided on this page are common starting points for configuration. Actual values are affected by material form, data volume and business rules. Specific issues require specific analysis, and it is recommended to test on your own samples before finalizing.
Three common mistakes
- Phenomenon: FastGPT fails to start after upgrading
fastgpt-mcp-server, and the console returns500 Internal Server Error. Cause: The new version of the MCP service modified the default listening port, and the service address and port in the FastGPT plugin configuration were not updated synchronously. - Phenomenon: Each time the water treatment financing daily report MCP tool is called, the current session context is cleared, making it impossible to call multiple tool nodes consecutively. Cause: The
retain_context_on_tool_callparameter was not enabled in the tool call configuration, resulting in the session context being reset after each tool call. - Phenomenon: When calling MCP in a workflow, only the basic parameters from the user's first input can be obtained, and the daily treatment scale and three-level region information of the water treatment project cannot be supplemented. Cause: The
workflow_multi_param_promptparameter was not configured, and users were not guided to supplement the exclusive required fields of water treatment financing daily reports.
How to confirm the configuration is correct
- Log in to the FastGPT plugin management page, check the synchronization status of the MCP service, confirm that the synchronization cycle matches the update rhythm of the water treatment financing daily report.
- Trigger a tool call, check if the returned data fields include all core fields of the water treatment financing daily report, and that the units meet the preset requirements.
- Test multi-parameter calls in a workflow, confirm that the system will guide users to supplement exclusive required parameters for water treatment, such as daily treatment scale and three-level region information.
- View the FastGPT running logs, confirm that no context reset errors occur during tool calls, and that the session context is normally retained.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.