What this category's data looks like
Oilfield service engineering financing daily report data is sourced from domestic petroleum and petrochemical industry financing filing publicity platforms, publicly disclosed documents of domestic and overseas exchanges, and public information from industry self-regulatory organizations. Updates are made for newly added oilfield service engineering financing projects each working day, and are delayed on non-working days. Each daily report organizes financing projects individually, including fields such as project name, oilfield service subdivision type, financing amount (unit: ten thousand yuan), financing subject, investor type, disclosure date, and project landing province. Each project includes a brief business background description.
What constraints do these characteristics impose on the "tool calling and plugins" workflow
The multi-source, scattered nature of the data requires tool calling to configure multi-data source aggregation logic, to avoid missing information from single interface calls. The working day update rhythm requires scheduled plugin triggers to be bound to working day execution rules, to reduce invalid calls on non-working days. The dedicated oilfield service subdivision type field requires tool calling field extraction rules to match the oilfield service engineering classification system, to avoid extracting non-oilfield service financing projects. The requirement that financing amounts use ten thousand yuan as the unit requires the plugin to include built-in unit conversion verification, to ensure consistent unit usage in output results. The structure of organizing documents by individual projects requires batch tool calls to adapt to pagination processing logic, to match the maximum entry limit for a single batch processing.
How to set the configurations
| Configuration Item | Recommended Value | Basis for This Value |
|---|---|---|
plugin_schedule_cron | 0 9 * * 1-5 | Matches the working day update rhythm of oilfield service engineering financing daily reports, only triggers plugin execution on working days |
multi_source_api_timeout | 30 seconds | Adapts to the interface call duration for multi-data source aggregation, avoids data loss caused by single interface timeout |
field_extract_category_rule | Oilfield Service Engineering Classification Mapping Table | Matches the dedicated classification system for oilfield service subdivisions, ensures accurate field extraction |
amount_unit_convert | Unify to ten thousand yuan | Adapts to the amount unit standard of oilfield service engineering financing daily reports, ensures consistent output result units |
batch_process_max_count | 20 entries/batch | Matches the conventional number of projects in a single daily report, avoids batch calls exceeding system processing limits |
api_auth_mode | Public data source authorization key | Legally connects to multi-source public financing data, complies with data usage specifications |
The parameter values provided on this page are conventional recommendations used to determine the starting point for configuration. Actual values are affected by material form, data volume, and business rules. Specific issues require specific analysis, and it is recommended to test on your own samples before finalizing the configuration.
Three common mistakes
- Phenomenon: Plugin execution returns the
ETIMEDOUTstatus code, and return content takes more than 600 seconds. Cause: The call sequence of multi-data source interfaces is not split, and multiple interface requests are initiated simultaneously, resulting in overall timeout. - Phenomenon: The oilfield service type field extracted by tool calling is empty. Cause: The dedicated oilfield service engineering classification mapping table is not loaded, and field extraction rules do not match the business classification system.
- Phenomenon: Duplicate entries exist in oilfield service engineering financing data retrieved by the knowledge base. Cause: No deduplication rules for multi-source data are configured, causing the same financing project to be retrieved repeatedly by multiple data sources.
How to confirm the configuration is complete
- Manually trigger plugin execution, verify that returned result fields include the dedicated oilfield service engineering classification, and that the amount unit meets preset standards.
- View scheduled task execution records, confirm that trigger times conform to preset working day rules.
- Call the tool interface, check that multi-source data aggregated results have no duplicate entries and cover the configured data source range.
- Test project counts across different batches, verify that batch processing configuration adapts to the conventional number of entries in a single daily report.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.