What the Data for This Category Looks Like
The data sources for wind power financing daily reports include the National Renewable Energy Power Project Information Management Platform, local energy administration public notification channels, corporate business ledgers of cooperating financial institutions, and internal project archives of wind power development enterprises. Data synchronization for same-day new projects and updated information is completed every day at midnight. Documents use structured table format, with four categories of fields:
- Project geography and basic information: includes wind farm location, project approval number
- Installation parameters: includes planned installed capacity (unit: megawatt)
- Core financing elements: includes planned financing amount (unit: ten thousand yuan), cooperating financial institutions, loan completion date, repayment term (unit: month)
- Project approval and progress status fields.
Constraints Imposed on Tool Calling and Plugins
Three core constraints are imposed on the tool calling and plugins workflow by the characteristics of wind power financing daily report data. First, multi-source data access requires plugins to support multiple authentication configurations to interface with different data sources such as energy management platforms and financial institution ledgers. Second, the fixed daily update rhythm requires tool scheduled triggering rules to match the daily report generation cycle. This avoids triggering interface rate limits from overly high call frequency, or missing same-day latest data due to call delays. Third, the clear classification of structured fields requires strict verification of input parameter field format and unit matching during tool calling. For example, installed capacity parameters must use values in megawatts, and financing amount parameters must use values in ten thousand yuan. This prevents data parsing errors caused by unit mismatches.
Configuration Settings
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
mcp_auth_type | api_key or oauth2 | Matches the authentication protocols supported by the connected energy management platform and financial institution data sources |
tool_call_timeout | 30 seconds | The response time of wind power financing daily report data source interfaces is usually within 20 seconds; 30 seconds covers conventional network fluctuation scenarios |
schedule_cron_expression | 0 0 2 * * * | Matches the daily report generation cycle of most data sources, ensuring that complete daily updated data is already available when triggering |
api_request_rate_limit | 10 requests per minute | Complies with the interface rate limit rules of most public energy and financial data sources, preventing call interception |
input_param_validate_mode | strict | The field units and format requirements for wind power financing daily reports are clear; strict verification prevents parameter format errors |
workflow_tool_split_rule | Split by the data source identifier carried in the request | Distinguishes between energy data and financial data tool calling links, avoiding configuration conflicts across data sources |
The parameter values provided on this page are conventional recommendations used as a starting point for configuration. Actual values are affected by material form, data volume, and business rules. Specific issues require case-by-case analysis, and it is recommended to test on your own samples before finalizing settings.
Three Common Misconfigurations
- Symptom: After adding HTTP response input parameter variables on the MCP service configuration page, the variable field shows as empty when saving the configuration. Cause: The "dynamic parameter parsing" switch is not enabled, so the system cannot parse custom fields in the HTTP response body as input parameter variables.
- Symptom: The reply generated by the large language model does not trigger tool calling, and directly returns general question-and-answer content. Cause: No trigger prompt words for tool calling are configured, or the input parameter fields do not match the instructions in the large language model context, so the large language model cannot recognize the calling requirement.
- Symptom: Tool calling and MCP calling requests in the workflow are not split as expected, and both types of tasks are routed to the same execution link. Cause: No clear request identifier judgment logic is configured in the split rules, so the system cannot distinguish the request types of the two types of tool calls.
How to Verify a Successful Configuration
- Access the FastGPT tool management page, review the configured MCP service list. Confirm the target wind power financing daily report data source has been added, and its authentication status shows normal.
- Submit a test tool calling request with simulated input parameters that conform to the field format of wind power financing daily reports. Check if the returned result includes correct fields and unit-matched data.
- Review workflow log records. Confirm tool calling and MCP calling requests are routed to their respective execution links, with no cross-mixing.
- Check scheduled task execution logs. Confirm the daily trigger time matches the configured
schedule_cron_expression, and that calls successfully return same-day updated data.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.