Reference only; verify against the target FastGPT release and deployment documentation.
What the Data for This Category Looks Like
The service consultation data for building construction general contracting mainly comes from official service guidelines released by housing and urban-rural development departments, project approval documents, construction progress reporting records, completion acceptance filing materials, and internal process forms of general contractors. Data update rhythm has two categories: Official service guidelines are updated quarterly along with policy adjustments, while project-specific data is submitted and updated in real time along with construction progress. The document structure is divided into three categories by service items: project establishment application, progress reporting, and completion acceptance. Each document includes fixed fields such as project number, construction unit, construction scope, floor area (unit: ㎡), contract amount (unit: ten thousand yuan), approval status, and others.
What Constraints Do These Characteristics Impose on the Forms and Interaction Link
The quarterly updates of official service guidelines require forms to support regular synchronization of the latest reporting specifications, and avoid using expired field requirements. The real-time requirement for project-specific data requires forms to support association with existing information of the current project, reducing repeated filling. Fixed units (㎡, ten thousand yuan) for fields require forms to have built-in unit verification logic to block non-compliant inputs. The distinction between multiple service items requires forms to be displayed by item category, avoiding confusion of fields from different processes and improving reporting efficiency.
How to Configure
| Configuration Item | Recommended Setting | Rationale |
|---|---|---|
formInput | Preset required field groups in accordance with housing and urban-rural development department service guidelines, and mark units (㎡, ten thousand yuan) | Building construction general contracting services must match official unified reporting specifications to reduce user-defined errors |
userSelect | Link project number to automatically bring out construction unit and construction scope | Building project information is interconnected; automatic filling reduces reporting errors |
| Form block display | Split into collapsible panels by three categories: project establishment, progress, and acceptance | Building construction service items cover multiple processes; block display simplifies page hierarchy |
| Auto-save timeout | Trigger after 600 seconds of inactivity | Single form filling takes a long time; this avoids data loss |
| Field unit verification | Force matching preset units, pop up a prompt when non-compliant units are entered | Fields related to building construction have fixed units; errors must be blocked in advance |
| Knowledge base retrieval return count | Top 10 entries | The number of relevant documents for building construction service consultation is moderate; the top 10 entries cover most reference content |
Three Common Misconfigurations
- Phenomenon: When configuring
formInputto reference knowledge base documents, search results include approval documents from non-building construction projects, and cannot accurately match the current service item. Cause: No screening parameter based on project number is set, resulting in the search scope covering all knowledge base documents. - Phenomenon: When adding team collaboration members, entering the username of the corresponding project leader shows as invalid. Cause: The real-name personnel information of the building construction project is not bound to the system user permissions, and the verification logic does not match the exclusive account within the project.
- Phenomenon: After submitting the form, the associated historical approval data is not automatically filled into the corresponding fields. Cause: The linkage trigger timing of
userSelectis not configured correctly, resulting in data synchronization not being triggered.
How to Confirm the Configuration is Complete
- Open the form for the corresponding service item, check whether the preset fields are consistent with the service guidelines released by the housing and urban-rural development department, and whether the unit markings meet the requirements.
- Enter any project number, verify whether the associated project information such as construction unit and construction scope is automatically brought out.
- Simulate a period of inactivity, check whether the draft is automatically saved and the draft content is complete.
- Submit a test form, check whether the historical approval data of the current project can be correctly associated and filled into the corresponding fields.
The values provided here are common starting points and should be evaluated against the user's own samples.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.