Document and Material Drafting for "Efficiently Complete One Task" Joint Handling: Deployment and Upgrade

Document and Material Drafting for "Efficiently Complete One Task" Joint Handling: Deployment and Upgrade

What this category of data looks like

Data mainly originates from the "One Task" zone of the national government service platform, local integrated government service platforms, electronic certificate databases, and various department approval systems. The update frequency is daily. Daily documents include joint handling item lists, one-time notice sheets, joint handling application forms, material circulation sheets, parallel approval opinions, and completion receipts. Fields cover item numbers, associated departments, material details, processing nodes, completion status, and other items. There is no fixed unified format, and processing requires adaptation to multiple types of document structures.

Since data sources cover multiple platforms and update daily, stability and compliance of multi-source data synchronization must be ensured. Diverse document types and non-unified field standards require adaptation to different document structures for chunking and vector generation. Joint handling data involves cross-department permissions, so storage and access compliance must be strictly controlled. At the same time, daily new original files, chunked data, and embedding vectors will continuously occupy disk space. Storage and cleanup strategies must be properly configured to avoid resource overload that affects normal operation of government services.

How to set the configurations

Configuration ItemSuggested SettingRationale
DB_MAX_LINK300–500 connectionsJoint handling data connects to multiple department systems, requires support for a relatively large number of cross-table connections to avoid synchronization interruptions caused by exhausted connections
STORAGE_S3_ENDPOINTFill in the address of the local government cloud storage nodeJoint handling data is mostly stored on government cloud platforms, adapting to compliance access requirements of official storage
REDIS_URLConfigure the address of the local government intranet Redis instanceEnsure low latency for joint handling data synchronization and caching, meeting real-time requirements of government services
FILE_TOKEN_KEYUse the unified issued secret key from the government platformEnsure compliance of access permissions for joint handling material files, avoiding unauthorized access
FE_DOMAINFill in the official domain name of the government service portalAdapt to cross-domain rules for front-end display, ensuring normal loading of interface resources
MONGODB_URIBind the address of the government-specific MongoDB clusterJoint handling data updates daily and its total volume gradually grows, requiring stable storage and read/write capabilities

Three Common Mistakes

  • Phenomenon: When adding joint handling attachments after an upgrade, the prompt fail to create post presigned url appears. Cause: FILE_TOKEN_KEY has not been synchronized to the new version-compatible secret key, or the node permissions configured in STORAGE_S3_ENDPOINT are insufficient, resulting in signature generation failure.
  • Phenomenon: The knowledge base disk usage continues to grow without automatic cleanup. Cause: No automatic archiving strategy has been configured for daily updated data, and the connection limit for DB_MAX_LINK has not been set, resulting in cache accumulation.
  • Phenomenon: The front-end interface model vendor icon loading fails. Cause: FE_DOMAIN has not been configured as the official domain name of the government service portal, triggering cross-origin resource sharing blocking.

How to confirm the configuration is correct

  • Log in to the storage monitoring panel in the FastGPT v4.17.0 backend, confirm that the connection count of the instance bound to REDIS_URL is stable within the configuration range of 300–500 connections.
  • Upload a joint handling application form, check whether the file access link can be generated normally, and that access matches the permission rules of the government platform.
  • View the static resource loading logs of the front-end page, confirm that there are no cross-domain error messages under the domain name configured in FE_DOMAIN.
  • Trigger a daily updated data synchronization task, check whether the update of the joint handling item list is completed normally, with no error logs.

The values given are common starting points and should be measured against the reader's own samples.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.