What this category of data looks like
Core data for this category comes from national public resource trading platforms, local public resource trading platforms, project approval systems, and bidding supervision systems. Updates occur daily. Commonly processed documents include bidding announcements, pre-qualification documents, bidding documents, tender documents, bid evaluation reports, winning candidate announcements, and winning result announcements. Data fields include exclusive content such as project qualifications, performance requirements, bill of quantities, and construction periods. Service subjects include development and reform departments, industry competent departments such as housing and urban-rural development, transportation, and water conservancy, public resource trading centers, and bidding agencies.
What constraints these characteristics impose on HTTP interfaces and external systems
Multiple data sources require interfaces to adapt to different authentication rules and data formats. The daily update frequency requires call frequency to match the synchronization rhythm of source systems. Complex document structures and exclusive fields require interface return data to accurately extract core business content, avoiding redundancy or omission. Strict requirements of the bidding process mean interface call stability and data accuracy are directly linked to project progress. Any data error or interface failure may cause process delays or compliance risks.
How to configure
Reference only; verify against the target FastGPT release and deployment documentation.
| Configuration Item | Recommended Approach | Rationale |
|---|---|---|
Authorization | Bearer {API key allocated by the public resource trading platform} | Complies with the interface authentication specifications of public resource trading platforms |
variables | Map project number, section ID, bill of quantities fields | Ensures generated bidding documents are accurately bound to corresponding projects |
responseData | Select bidding announcement body, qualification requirements, core content of bid evaluation reports | Meets core business data requirements for document drafting |
| Call timeout threshold | 60 seconds | Adapts to the conventional response duration of public resource trading platforms |
| Retry count | 2-3 times | Addresses call failures caused by temporary interface fluctuations |
Three common mistakes
- Phenomenon: External interface calls return a 401 unauthorized error, or
Authorizationparameter verification fails. Cause: TheAuthorizationparameter is not configured correctly, or the key has expired and was not updated in a timely manner. - Phenomenon: Database connection permission errors occur after restarting the deployed service. Cause: Database configuration parameters are not persistently stored, and configuration loss after restart causes authentication failure.
- Phenomenon: Corresponding data IDs are not obtained when synchronizing bidding documents in batches, making local mapping impossible. Cause: The binding relationship between local fields and interface returned IDs is not configured via
variables, resulting in missing data association.
How to confirm the configuration is correct
- Call the configured external interface, check that the
Authorizationparameter is correctly carried, and the returned status code is 200. - Check that the project fields mapped via
variablesmatch the locally stored bidding project metadata. - Verify that the fields configured in
responseDataappear completely in the interface return results. - Simulate a single call and check that the generated document draft includes the required core bidding content.
The values provided here are common starting points and should be measured against the reader's own samples.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.