What the data for this category looks like
Service entities for this category include construction quality and safety supervision stations, construction contractors, supervision units, and project owners. Daily generated documents include supervision plans, supervision inspection records, hidden danger rectification notices, quality problem handling forms, and completion acceptance supervision reports. Data sources cover engineering quality and safety supervision systems, on-site construction personnel real-name management platforms, supervision logs, and test reports. The update frequency is weekly. Document structures typically include fields such as project identifiers, responsible entities, inspection content, rectification requirements, and acceptance conclusions. There is no unified fixed unit, and some fields must match actual on-site engineering parameters.
How these characteristics impose constraints on HTTP interfaces and external systems
This category has scattered data sources spanning multiple on-site construction sites and supervision systems. Interfaces must be compatible with different return formats and permission verification rules. The weekly update frequency means interface calls should not be overly frequent; reasonable request intervals and timeout settings are required. Daily document fields cover diverse content, so interface requests must pass corresponding project and document identifier parameters via variables. Data is bound to specific engineering projects, so interfaces must support passing project numbers as core matching conditions to avoid cross-project data confusion. Interfaces must also adapt to content extraction requirements for different document types.
Configuration Setup
Reference only; verify against the target FastGPT release and deployment documentation.
| Configuration Item | Recommended Setting | Rationale |
|---|---|---|
Authorization | Carry a Bearer token from the external supervision system | Adapt to the permission verification requirements of construction-related systems |
variables | Pass project number and document type parameters | Match the field matching requirements for different projects and documents |
| Single search limit | Top 5 entries | Adapt to the volume of weekly updated documents |
responseData | Extract structured fields and text content | Adapt to content extraction needs for document drafting |
| Timeout period | 600 seconds | Adapt to the time required for on-site data retrieval |
| Reordering | Enabled | Improve recall priority for core supervision-related documents |
Three Common Mistakes
- A 514 status code is returned when calling an HTTP interface. This occurs because the
Authorizationparameter is not correctly configured, and a valid permission token from the external supervision system is not included. - No eligible text content appears in interface return results. This occurs because structured text fields are not correctly extracted via
responseData, and raw non-text data is returned directly. - Document data for the target project cannot be located. This occurs because matching parameters such as project numbers are not passed in
variables, so the interface cannot associate with the data source of the target project.
How to Confirm Proper Configuration
- Execute a curl test request, check whether the
Authorizationparameter carries a valid token, and confirm that the return status code is 200. - Review the fields extracted via
responseData, confirm that core parameters such as project number and document type are included, and match the actual data of the current project. - Verify that the interface return content includes core fields of target documents such as supervision plans and hidden danger rectification notices, and adjust the single search limit and reordering configuration to meet requirements.
- Test consecutive interface calls, confirm that the timeout setting adapts to the actual time required for data retrieval, and there are no frequent timeouts.
The values given are common starting points and should be measured against the reader's own samples.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.