Declaration Materials and File Review for Engineering Construction Project Approval: Tool Calling and Plugins

Declaration Materials and File Review for Engineering Construction Project Approval: Tool Calling and Plugins

This guide is developed for FastGPT v4.17.0. It organizes relevant configurations, parameters, and failure handling rules for tool calling and plugins in the declaration materials and file review scenario of engineering construction project approval.

What this category of data looks like

The data for this category mainly comes from the engineering construction project approval management system, construction drawing review system, enterprise qualification database, and public credit platform. The update frequency is once per day. Daily processed documents include construction permit application materials, construction drawing review qualification certificates, quality and safety supervision procedures, and completion record forms. Document fields cover project number, participating units’ qualifications, personnel practice qualifications, approval node status, and more. Some documents include multi-modal files such as construction drawing PDFs and qualification scan copies. The content scale and format of single documents vary widely.

Data sources are scattered. Multiple external interfaces must be called to obtain qualification, credit, and other information. The daily update frequency requires tool calling to adapt to real-time data pulling logic. Daily documents include plain text approval applications and multi-modal attachments. Calling paths that distinguish different data types must be configured. File review requires associating data from multiple systems. Tool calling must ensure consistency checks for cross-system data, to avoid review deviations caused by data lag. The approval process has strict field verification requirements. Tool calling must accurately match document fields and verification rules, to ensure returned data meets business review requirements.

How to set configurations

Configuration ItemRecommended SettingRationale
toolChoiceAutomatically switch based on data typeAdapt to different calling requirements for plain text approval materials and multi-modal construction drawings, match mixed data processing scenarios in business
functionCallEnable mandatory verification modeEnsure fields returned by tool calling fully match approval document fields, meet precise verification requirements for file review
External interface call timeout30 secondsAdapt to real-time requirements of cross-system data pulling, avoid blocking approval processes due to interface delays
Multi-modal attachment call limitFirst 3 entriesMatch the feature of small number of attachments in daily approval materials, reduce unnecessary tool calling overhead
Data synchronization frequency1 time per dayMatch the daily update rhythm of business data, ensure timeliness of data used for review

Three common errors

  • When configuring toolChoice, fail to distinguish data types. This causes multi-modal construction drawings to be passed to plain text models, leading to incorrect return formats or no valid results. The root cause is that no corresponding calling rules are configured for document types, and the processing logic for multi-modal and plain text data is mixed up.
  • Set external interface call timeout too short. This causes data pulling failures from the enterprise qualification database and public credit platform, returning empty fields. The root cause is failure to adapt to response delays of cross-system interfaces, and not reserving sufficient calling time.
  • Do not enable field verification for functionCall. This causes the returned participating unit qualification information from tools to not match the fields in approval documents, leading to file review errors. The root cause is that the mandatory verification mechanism is not enabled, so consistency between returned data and business fields cannot be guaranteed.

How to confirm the configuration is correct

  • Upload a test document containing plain text application materials and multi-modal construction drawings, check whether the tool calling automatically switches to the corresponding processing logic.
  • Call external interfaces to obtain enterprise qualification data, verify whether the field format of the returned results matches the field requirements of approval documents.
  • Simulate a cross-system data pulling scenario, confirm whether the interface call timeout setting meets the actual business response requirements.
  • Check the tool calling logs, confirm that the verification rules for functionCall are normally enabled, and there are no error prompts for field mismatches.

The values provided here are common starting points, and should be evaluated against the reader's own samples.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.