Declaration Materials and File Review for Construction Project Environmental Impact Assessment Approval: Tool Calling and Plugins

Declaration Materials and File Review for Construction Project Environmental Impact Assessment Approval: Tool Calling and Plugins

What this category of data consists of

Data for this category comes from the national unified construction project environmental impact assessment (EIA) declaration and approval system, ecological environment zoning control results, pollution discharge permit platform, and monitoring data. Update frequency is irregular. Commonly processed documents include environmental impact assessment reports or report forms, approval applications, public participation explanations, technical assessment opinions, and EIA approval documents. Document structure follows the EIA approval process, with fixed sections including project overview, pollution prevention measures, public participation, and more. Fields include project category, EIA level, details of pollution prevention plans, and so on. There are no unified fixed units; values adjust based on specific document content.

What constraints these characteristics impose on the tool calling and plugins workflow

Because data sources involve multiple independent systems, tool calling must support parallel pulling and integration of multi-source data to avoid data inconsistency. EIA documents have complex structures with fixed sections. Tools must be able to recognize section divisions across different documents and accurately extract content for the corresponding review link. Irregular update frequencies mean tools must support real-time or on-demand pulling of the latest data, and cannot rely on fixed-cycle caching. Core review links include project category verification, pollution prevention measure review, and other tasks. Tool calling must accurately match dedicated fields, otherwise review errors may occur. Additionally, the consequences of errors are severe, so the parameter verification link for tool calling must be strictly configured to prevent incorrect data from entering the review process.

Configuration settings

Reference only; verify against the target FastGPT release and deployment documentation.

Configuration ItemRecommended SettingRationale
toolChoiceautoAutomatically matches different tool scenarios including declaration material review and file verification, adapting to multi-link review requirements
functionCallEnable parameter verificationPerforms validity checks on tool calling parameters to prevent incorrect fields from entering the review process
Tool call timeout setting600 secondsEIA declaration materials have substantial content, so sufficient time is required to complete document parsing and data pulling
Maximum number of results returned by a single tool callTop 10 entriesThe number of relevant data entries required for file review is moderate, preventing excessive redundant information from interfering with review
Document chunking strategyChunk by EIA document sectionsEIA documents have fixed section structures; chunking by sections allows accurate extraction of content for the corresponding review link
Context window configuration8000–12000 tokenEIA declaration materials have substantial overall content, so sufficient context is needed to retain all information relevant to review

Three common configuration errors

  • Phenomenon: Tool calls return empty results, and valid content from declaration materials cannot be extracted. Cause: Interface permissions for multi-source data docking were not configured correctly, resulting in failure to pull data from the national unified construction project EIA declaration and approval system.
  • Phenomenon: Generated review matching rules cannot correspond to EIA-specific fields, resulting in parameter mismatch errors. Cause: Dedicated fields such as project category and EIA level from declaration materials were not accurately mapped to tool calling parameters, causing the tool to fail to recognize corresponding review content.
  • Phenomenon: Plugin configurations cannot be re-exported as schema format files, making subsequent modifications difficult. Cause: Plugin settings were not saved in the standard tool configuration format, resulting in exported schema files that do not meet requirements.

How to confirm correct configuration

  • Submit a standard EIA approval application material to trigger tool calling, and check whether corresponding data source content can be correctly pulled and preliminary review completed.
  • Manually input a known project category and EIA level to verify whether the tool can accurately call the corresponding review rules for verification.
  • View tool call logs to confirm that parameters are passed correctly, with no null values or incorrect fields.
  • Simulate a complete file review process to check whether tool return results cover core links that need verification, such as pollution prevention measures and public participation explanations.

The values provided are common starting points and should be measured against the reader's own samples.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.