Coal-Electric Integration Declaration Materials and Case Review: Multi-turn Dialogue and Prompt Engineering

Coal-Electric Integration Declaration Materials and Case Review: Multi-turn Dialogue and Prompt Engineering

What this category of data looks like

Coal-electric integration declaration materials and case data primarily come from central and state-owned enterprise internal coal production capacity declaration, coal-electric project filing and approval archiving systems. Updates are triggered temporarily along individual project’s declaration cycles, and are also updated regularly via scheduled archiving on a routine basis. A single declaration material includes four core document types: main qualification documents, production capacity accounting forms, environmental impact assessment (EIA) approvals, and approval process node records. Fields include project number, approved production capacity, approval level, submission date, and more. Units involve professional measurement standards such as ten thousand tons per year, ten thousand kilowatt-hours, ten thousand yuan, and others.

Single declaration materials are relatively lengthy. Multi-turn dialogue must retain multiple rounds of approval questions and historical responses to avoid context breaks. Fields include professional measurement units, so prompt engineering must accurately match corresponding rules to prevent review deviations caused by unit confusion. Data is updated temporarily alongside project progress, so the dialogue link must retrieve the latest archived content in real time, and cannot rely on static knowledge base caching. Multi-round review involves multiple approval nodes, so session identifiers must be used to distinguish different tasks to avoid cross-use of data from different projects.

How to set up configurations

Reference only; verify against the target FastGPT release and deployment documentation.

Configuration ItemRecommended SettingRationale
Maximum Context Length8000–12000 charactersSingle coal-electric integration declaration materials often exceed 5000 characters, so multi-round approval questions and historical responses must be retained
Single Dialogue Timeout600 secondsCase review requires retrieving multiple related documents, to avoid mid-process interruptions
variables bindingBind project number and approved production capacity unit variablesEnsure automatic matching of field rules for the corresponding category during review, reducing manual input errors
Knowledge Base Retrieval CountTop 6–10 entriesDeclaration material related data is scattered, so coverage of three core document types (qualification, EIA, production capacity) is required
chatId configurationFixed binding to project session IDEnsure context consistency across multi-turn dialogue, avoiding cross-project data confusion
Dialogue History Retention RoundsRetain the most recent 10 rounds of dialogueCover complete questions and responses from multi-round approval, supporting process handover for subsequent review nodes

Three Common Mistakes

  • The workflow terminates directly after the AI reply step, with no subsequent node triggered. The cause is that the chatId parameter is not bound, resulting in the loss of context session identifiers for multi-turn dialogue, and subsequent processes cannot associate the current review task.
  • Frequent timeout errors occur in dialogue, with a 504 status code displayed. The cause is that the single dialogue timeout setting is lower than 600 seconds, which does not adapt to the time-consuming requirement of retrieving multiple related documents.
  • The plugin only triggers during the first dialogue, and subsequent questions cannot call the plugin. The cause is that the dialogue history retention rule is not correctly configured, the messages content is not fully transmitted, and the plugin trigger conditions are not met.

How to Verify Proper Configuration

  • Initiate a query containing the project number, check whether the reply automatically matches the field rules of the corresponding category, such as the production capacity unit displayed as "ten thousand tons per year".
  • Initiate two consecutive queries, check whether the complete messages content is retained in the dialogue history, with no context loss.
  • Simulate a long review process, wait longer than the preset timeout period, confirm that the dialogue does not automatically interrupt.
  • Test plugin triggering, initiate a second query, confirm that the plugin can be called normally.

The values provided are common starting points and should be measured against the reader's own samples.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.