What this category of data looks like
Data sources for this category include the national government procurement website, local government procurement websites, the fiscal integration system, the procuring entity budget system, and supplier credit records. Daily business documents cover all process nodes: procurement requirements, procurement plans, bidding documents, submission documents, bid evaluation reports, winning bid announcements, procurement contracts, and responses to queries. Core fields include procurement entities, project progress, and document status. Data update frequency is daily. No additional custom statistical fields are included. All content complies with standard format requirements for government procurement business.
Constraints Imposed by These Characteristics During Deployment and Upgrade
Data sources are scattered and require integration with multiple official systems. Deployment requires configuration of multiple data source connection parameters to sync full business data. The daily update frequency requires configuration of scheduled sync tasks after deployment to ensure data timeliness. Structural differences across multiple types of business documents require the knowledge base parsing module to adapt field extraction rules for different document formats. Additionally, errors in business processes can lead to serious consequences such as bid invalidation, valid complaints, and regulatory penalties. Deployment requires configuration of failure retry and alert mechanisms to ensure stability and compliance of business process guidance.
Configuration Settings
Reference only; verify against the target FastGPT release and deployment documentation.
| Configuration Item | Recommended Value | Rationale |
|---|---|---|
MONGODB_URI | mongodb://[username]:[password]@[host]:[port]/[database]?authSource=admin | Business documents and process data for government procurement projects require persistent storage. Configure a database connection with permission verification to ensure data compliance |
REDIS_URL | redis://:[password]@[host]:6379/0 | Used to cache frequently accessed procurement document metadata and session information. Configure an access password to prevent unauthorized access |
STORAGE_S3_ENDPOINT | https://s3-internal.[gov-cloud-domain].com | Procurement documents must be stored in internal object storage services that meet regulatory requirements. Fill in the access endpoint address for the corresponding service |
DB_MAX_LINK | 20–30 | Government procurement data is updated daily and has concurrent access peaks. Limiting the number of connections prevents database resource exhaustion and ensures stability of sync tasks and real-time queries |
FILE_TOKEN_KEY | Randomly generated 32-character string with no special characters | Used to generate temporary access tokens for downloading procurement documents, ensuring access security for sensitive business documents |
FE_DOMAIN | https://gov-proxy-fastgpt.[your-domain].com | Configure a compliant front-end access domain name to adapt to internal access rules and security policies for government procurement scenarios |
Three Common Misconfigurations
- Phenomenon: The model list does not update after modifying
config.json. Cause: The FastGPT backend container was not restarted, so the new configuration was not loaded and took effect. - Phenomenon: An error is returned when clicking the knowledge base module, with status code 500. Cause:
MONGODB_URIorPG_URLwas not configured correctly, resulting in a failed database connection and inability to read knowledge base data. - Phenomenon: Business process guidance frequently times out after private deployment. Cause:
DB_MAX_LINKwas not adjusted to adapt to concurrent volume, resulting in exhausted database connections and inability to respond to high-frequency requests.
How to Verify Successful Configuration
- Run
docker compose logs backendto view backend startup logs, confirm that there are no error messages for service connections configured viaMONGODB_URIandREDIS_URL. - Upload a standard procurement requirement document, verify that the knowledge base parses successfully, and that document metadata can be viewed and retrieved normally in the backend management interface.
- Manually trigger a scheduled sync task, confirm that procurement documents from the designated channels of the national government procurement website are successfully pulled and stored in the knowledge base.
- Generate a temporary file download token, verify via the front-end interface that the token can be parsed normally with no verification failure errors, confirming that the
FILE_TOKEN_KEYconfiguration takes effect.
The values provided are common starting points and should be measured against the reader's own samples.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.