Requirements and Design Document Drafting for On-Site Deployment Implementation: Forms and Interactions

Core data for on-site deployment implementation originates from customer data center environments, equipment inventories, software packages, and

What This Category of Data Looks Like

Core data for on-site deployment implementation originates from customer data center environments, equipment inventories, software packages, and network topologies. Four types of documents are produced regularly: deployment manuals, installation records, configuration lists, and on-site check-in forms. Data is updated once per order or per deployment phase. Fields include data center IP ranges, equipment models, software versions, network bandwidths, on-site check-in times, and more. Structured fields for corresponding documents must fully align with actual parameters collected on-site, with no extra redundant or missing items.

Constraints Imposed on Forms and Interactions

Data sources are scattered and correspond to multiple document types. Forms must be split into independent entry areas by document module to avoid mixed information. Update frequency follows phased cycles. Split saving and resume filling functions must be implemented by external systems separately. FastGPT form nodes only support single-submission input collection to prevent operational errors caused by too much content in a single submission. The uniqueness of on-site environment parameters requires forms to connect with field verification logic from external business systems. This prevents subsequent deployment failures caused by incorrect information entry. Hierarchical network topologies and equipment structures require interaction processes to support hierarchical selection, matching the step-by-step inquiry logic of a question tree.

Configuration Settings

The following configurations are based on FastGPT v4.17.0.

Configuration ItemRecommended ApproachRationale
Form Input Node formInputTest example: Select 3 fields from on-site deployment implementation fields as required inputs; actual fields are determined per taskThis node collects user input; missing required items require checking interaction status to avoid subsequent nodes failing to receive complete inputs
User Selection Node userSelectTest example: Set 2 business options, check corresponding branches one by oneThis node handles user selection; query and filtering of on-site deployment implementation related records must be implemented by subsequent interfaces or external systems
Post-Submission Field PassingTest example: Prepare 10 on-site deployment implementation input samples, covering complete filling, missing required items, and canceled operationsCompare input and node output to verify whether subsequent nodes receive corresponding fields; result thresholds are determined per actual task
External Implementation Item: File Upload Format RestrictionMust be implemented by external systems separately; configured by external business systems separately, test examples can cover common formats such as .zip, .tar, .exeAdapt to diverse upload needs for software packages and configuration files, connect to external call links
External Implementation Item: Multi-Step Form Trigger RulesMust be implemented by external systems separately; trigger subsequent workflow nodes based on previous field filling resultsMatch the question tree-style interaction logic to gradually collect on-site environment information
External Implementation Item: Form Timeout DurationMust be implemented by external systems separately; 1800 seconds (test example duration)Cover the single-phase operation duration of on-site deployment to avoid session failure mid-process

Three Common Misconfigurations

  • Symptom: Interaction process cannot return to the previous level of options, getting stuck in a fixed branch. Verification Steps: Check whether the workflow is configured with a branch rollback node, and whether subsequent nodes are only triggered in a fixed order.
  • Symptom: Uploaded software packages cannot be properly recognized by external links. Verification Steps: Check the file upload format restriction configuration, confirm whether only a small number of specified formats are allowed.
  • Symptom: Corresponding fields in the deployment manual are empty after form submission, making it impossible to generate official documents. Verification Steps: Check whether form input content is passed to the external document generation system, confirm whether field mapping logic is configured.

How to Confirm Proper Configuration

  • Fill in simulated data center IP address and equipment model, check whether the external business system's required verification logic pops up a prompt when the form is not fully filled.
  • Switch hierarchical drop-down options, confirm whether subsequent workflow nodes are correctly triggered based on the selection results of userSelect, matching the preset question tree logic.
  • Upload a compressed package in any common format, confirm that the file upload component supports this format by default and can complete submission normally.
  • Wait 1800 seconds without any operations, check whether the form session does not show a timeout error and remains available normally.

All provided configuration values are common starting points, and should be evaluated against your own specific samples and use cases.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-10-19.