What this category's data looks like
Kindergarten childcare daily life management involves materials such as daily life schedules, morning and afternoon check records, and child health observation records. The sources are class childcare execution and health room aggregation, updated daily and archived weekly. The daily life schedule lists time periods, segments, and responsible persons; morning and afternoon check records include body temperature, oral cavity, skin, mental state, and signature; child health observation records include water intake, food intake, bowel movements, emotions, and handover receipts. When materials enter workflow orchestration, the schedule serves as the main process skeleton, while morning and afternoon check records and health observation records serve as branch bases. Together, the three determine the direction of material drafting and responsibility handover. Only when fields are complete, responsible persons are clear, and versions and dates are consistent can it be issued and handed to the next stage for receipt.
Configuration and implementation checks
This step is executed by workflow nodes (user selection and branching), outputting branch directions and interaction status records. "Issuable material drafts and handover records" are completed by subsequent nodes continuing execution according to the branch. When the user selection node is triggered, the conversation enters an interactive state and records the workflow status. After the selection is completed, execution continues along the branch corresponding to the selected option.
| Object | Check | Verification action |
|---|---|---|
| Daily life schedule | Time periods, segments, and responsible person fields are complete, dates and versions are consistent, and signatures are complete | Check fields and signatures, verify options and branch connections one by one in the node, and confirm that variables have been referenced |
| Morning and afternoon check records | Body temperature, oral cavity, skin, mental state, and signature are complete, and the date is consistent with the schedule | Trigger once, view the node status in the run record, and confirm that nodeId points to the correct branch |
| Child health observation records | Water intake, food intake, bowel movements, emotions, and handover receipts are complete, and names, quantities, and dates match | Reference the selection result variable in subsequent nodes and run a trial once, checking the receipt and signature |
Three common errors
- Phenomenon: The name, quantity, and date of the same record do not match between the schedule and the morning and afternoon check records. Cause: The two materials were drafted separately and did not reference the same variable within the same branch.
- Phenomenon: Versions are not synchronized, and an old version of the schedule coexists with a new receipt. Cause: After the interaction was completed, execution did not continue according to the branch, and the status record remained at the old node.
- Phenomenon: Signatures or receipts are missing, and materials cannot be issued. Cause: Options and branch connections were not checked one by one, and the default branch was mistakenly taken.
How to verify the setup
Acceptance of this function: Run trials for each option one by one, check the branch direction and interaction status in the run record, and confirm that variables, nodeId, and the selection result variable have all been passed.
Business test: Draft one copy according to the template and complete one handover to see whether missing items are blocked.
- Check options and branch connections one by one in the node, and confirm that each option corresponds to one branch.
- Trigger the user selection node once, and view the node status and selection result variable passing in the run record.