What the data for this category looks like
Data sources for ordnance and equipment marketing content include official technical documents from equipment development units, official promotional materials, and government procurement bidding announcements. The update schedule follows bulk updates when new equipment is finalized or annual promotional materials are revised, paired with one-off updates for temporary marketing campaigns. Most document structures combine structured parameter tables and scenario-based explanatory text, with fields including equipment model, combat performance parameters, applicable scenarios, compliance approval identifier and others. Some parameters have clear physical units such as kilometers, kilograms, rounds per minute.
What constraints these characteristics impose on the "workflow orchestration" link
Structured parameters and fields with physical units require workflow configuration of parameter type validation rules to prevent unit mixing or missing parameters. Multiple data sources require configuration of data source permission validation nodes to distinguish call permissions between internal promotional materials and public bidding information. Irregular update schedules require workflows to support both scheduled synchronization and manual trigger update modes to adapt to material needs for temporary marketing campaigns. The compliance approval identifier field requires the workflow to automatically validate the status of this field before generating marketing content. Materials that have not passed approval cannot enter subsequent generation links.
How to set the configurations
| Configuration Item | Recommended Approach | Basis for This Approach |
|---|---|---|
Knowledge Base ID Dynamic Binding | Passed via the global variable workflow_kb_id | Adapt to the knowledge base call requirements of different equipment categories, avoid hardcoding fixed IDs |
Knowledge Base Recall Threshold | 0.75–0.85 | Ordnance and equipment parameter-based content requires high matching accuracy to avoid irrelevant equipment information being mixed into marketing content |
Global Variable Assignment Rules | Prioritize parameters passed from the workflow, use plugin default values if not obtained | Adapt to the need for dynamic replacement of equipment models and parameters in marketing content, while ensuring basic functionality is available |
Knowledge Base Synchronization Frequency | Daily 2:00 AM + Manual Trigger | Adapt to the bulk update schedule for new equipment finalization and annual revisions, balance real-time performance and resource usage |
Workflow Node Timeout Period | 600 seconds | Ordnance and equipment documents are usually lengthy, requiring longer processing time for parameter parsing and recall |
Compliance Check Node Trigger Condition | Execute before the marketing content generation node | Ensure that equipment materials that have not passed approval cannot enter the generation link, meeting compliance requirements |
The parameter values given on this page are all conventional recommendations used to determine the starting point for configurations. Actual values are affected by material form, data volume and business rules. Specific issues require specific analysis, and it is recommended to test on your own samples before finalizing settings.
Three common mistakes
- Phenomenon: An error "No matching knowledge base found" or "Invalid parameter" is prompted when calling knowledge base search. Cause: The knowledge base ID is not passed correctly via the global variable, or the passed ID does not match the knowledge base bound to the current workflow.
- Phenomenon: Plugin parameters in the workflow cannot be obtained from the specified variable, and fallback to the default value does not take effect. Cause: The assignment priority of the global variable is not configured correctly, or the variable name does not match the variable name bound to the plugin parameters.
- Phenomenon: Unit errors or missing parameters appear in the generated marketing content. Cause: No parameter type validation rules are configured, and the units and field requirements of equipment parameters are not verified, resulting in mismatched content being mixed in.
How to confirm the configuration is complete
- Manually trigger the workflow, pass the test
workflow_kb_idand equipment model parameters, check whether the content of the corresponding knowledge base can be recalled normally. - Trigger a manual knowledge base synchronization, check whether the newly added equipment documents and parameter information are displayed in the synchronization log.
- Intentionally pass the identifier of materials that have not passed compliance approval, check whether the workflow intercepts the process before the generation node.
- Adjust the knowledge base recall threshold, verify whether the matching accuracy of the recall results meets the expected configuration.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.