What the Data for This Category Looks Like
Data sources include public disclosure platforms of local energy regulatory authorities, internal investment and financing system interfaces of power grid enterprises, and new energy project bidding announcement channels. The data update rhythm is daily T+1 release: full financing project information for the previous calendar day is disclosed the next day. The document structure is structured JSON or CSV format, containing fields such as project unique identifier, project name, affiliated provincial power grid region, financing amount, financier type, financing term, annualized interest rate, disclosure date, etc. The unit of financing amount is ten thousand yuan. The region field is divided according to provincial administrative regions.
Constraints Imposed on HTTP Interfaces and External Systems
Since data sources involve cross-department systems, HTTP interfaces must support multi-data-source aggregated requests to avoid increased link complexity caused by calling multiple interfaces in a single request. The fixed daily update rhythm requires that the scheduled synchronization tasks supporting the interface must match the release cycle to avoid data lag or repeated pulling. Fields include classification dimensions such as provincial regions and project types, so the interface must support parameter configuration for filtering by dimensions to narrow the returned data scope. Some data involves industry-sensitive information, so the interface must integrate permission verification logic to prevent unauthorized access. The number of power project financing entries varies with regional scale, so the interface must support pagination parameter configuration to adapt to data return requirements of different scales.
How to Configure Settings
| Configuration Item | Recommended Setting | Rationale |
|---|---|---|
api_request_timeout | 600 seconds | Power financing daily report data sources are mostly cross-department interfaces. A single request may include multi-source data aggregation, and 600 seconds covers most interface response durations. |
daily_sync_cron | 0 8 * * * | Matches the daily report release time of most local energy regulatory authorities, triggers synchronization at 8:00 daily. |
response_pagination_limit | 1000 items/page | The single-page data volume adapts to the conventional entry scale of power project financing, avoiding excessively large single returned data sets. |
request_auth_type | API_KEY + IP whitelist | Power financing data involves industry-sensitive information. Dual verification reduces the risk of unauthorized access. |
field_mapping_rule | Map according to officially disclosed fields | Avoid parsing failures caused by mismatched field names, adapting to the unified format requirements of multi-source data. |
data_source_filter | Filter by power grid region and project type | Narrow the request scope, reduce invalid data transmission, and improve interface response speed. |
The parameter values provided on this page are all conventional recommendations used to determine the starting point for configuration. Actual values are affected by material form, data volume and business rules. Specific issues require specific analysis. Testing on independent samples is recommended before finalizing settings.
Three Common Misconfigurations
- An interface call returns
400 Bad Requestor field parsing results are empty. The cause is incorrect configuration offield_mapping_rule, with mismatched mapping between original field names of the external interface and internal field names of the system. - A scheduled synchronization task returns
504 Gateway Timeoutafter triggering. The cause is failure to adjust the value ofapi_request_timeout, using the default short timeout setting that cannot cover the request duration of multi-source data aggregation for power financing daily reports. - Parameter configuration in the Python script request body is incorrect, resulting in an empty interface return result. The cause is confusion between parameter names required by the external interface and field names entered by the system, without matching the request parameter rules in the official documentation.
How to Verify Correct Configuration
- Call the test interface, pass the preset provincial power grid region parameter, and check whether the returned results include power financing project data from the corresponding region.
- View the scheduled task log to confirm that synchronization is triggered at the specified time every day, with no timeout or error records.
- Check the fields returned by the interface to confirm that they are consistent with the configured
field_mapping_rule, with no missing or format errors. - Verify the interface permission verification: use an unauthorized IP or a request without an API_KEY, and confirm that the
403 Forbiddenstatus code is returned.
Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-14.