Policy and Regulatory Basis Q&A for Engineering Construction Project Approval: Deployment and Upgrade

Policy and Regulatory Basis Q&A for Engineering Construction Project Approval: Deployment and Upgrade

What the data for this category looks like

This category's data comes from the engineering construction project approval management system, construction drawing review system, enterprise qualification database, and public credit information platform. The update frequency is daily. Daily documents include construction permit application materials, construction drawing review qualification certificates, quality and safety supervision procedures, completion acceptance record forms, and more. Fields cover approval item numbers, participating construction units' qualification levels, personnel practice qualifications, approval node status, and other items. It uses government approval standard formats, with no custom special units. Data is scattered across multiple official business systems.

What constraints these characteristics impose during deployment and upgrade

Reference only; verify against the target FastGPT release and deployment documentation.

How to Configure Settings

Configuration ItemRecommended SettingRationale for This Setting
MONGODB_URIConfigure the address of a government intranet-exclusive MongoDB instanceStore the daily updated approval data for this category to ensure data isolation
REDIS_URLConfigure a local Redis instance, set cache validity period to 86400 secondsCache daily synchronized approval document metadata to reduce repeated pull overhead
STORAGE_S3_ENDPOINTConfigure the access endpoint for government cloud storageStore compliant documents such as construction permits and completion acceptance record forms
FILE_TOKEN_KEYConfigure a 32-bit random secret keyGenerate temporary access tokens for approval documents to ensure document access security
ROOT_KEYConfigure an exclusive operation and maintenance secret keyRestrict management of Q&A system configurations to authorized personnel only
DB_MAX_LINKSet to 20–30Adapt to the concurrent connection requirements of multiple system data sources for this category, avoid resource exhaustion
FE_DOMAINConfigure a government intranet-exclusive domain nameAdapt to the access permission requirements of government systems

Three Common Misconfigurations

  • Symptom: After offline deployment, policy Q&A cannot extract approval document content, and the interface displays empty fields. Cause: No adaptation rules for government document parsing in an offline environment were configured, resulting in failure to recognize standard approval document formats.
  • Symptom: After deployment, some approval node Q&A returns no results, and logs show timeout errors. Cause: The DB_MAX_LINK parameter was not adjusted, and insufficient concurrent connections caused database access timeouts.
  • Symptom: Local Docker deployment results in port conflicts or startup failure, making the Q&A interface inaccessible. Cause: FE_DOMAIN was not configured according to government intranet port specifications, and an occupied public port was used.

How to Verify Successful Configuration

  • Execute the daily synchronization task, check whether documents from government data sources are successfully pulled and stored in the specified database.
  • Initiate a policy Q&A test to verify that matching approval document content and corresponding basis can be returned.
  • Check the storage service access logs to confirm that upload and read operations for approval documents comply with permission requirements.
  • View the system monitoring panel to confirm that the connection counts for database and cache services are within normal ranges.

The values given are common starting points and should be measured against the reader's own samples.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.