Declaration Materials and File Review for Construction Project EIA Approval: Deployment and Upgrade

Declaration Materials and File Review for Construction Project EIA Approval: Deployment and Upgrade

What the Data for This Category Looks Like

This category involves four types of entities: ecological environment department EIA offices, administrative approval bureaus, project construction units, and EIA institutions. Daily work involves processing documents such as environmental impact assessment reports, environmental impact assessment report forms, approval applications, public participation statements, technical assessment opinions, and EIA approval documents. Covered fields include basic project information, pollution prevention measures, public participation content, and approval process nodes. Data sources include the national unified construction project EIA declaration and approval system, ecological environment zoning control results, pollution discharge permit platform, and monitoring data. Update frequency is irregular, with no fixed synchronization cycle.

Constraints on Deployment and Upgrade

Data sources for this category are scattered, and updates have no fixed cycle. During deployment, configure data integration logic across multiple systems to ensure synchronized access to the latest EIA project information and documents. Daily document formats and fields vary widely. Adapt parsing rules for different types of EIA documents to avoid parsing failures or incomplete field extraction. Approval errors directly lead to project suspension, revocation of approvals, or subsequent law enforcement accountability. Strengthen data verification and permission control during deployment to ensure the accuracy and security of the review process. Multiple concurrent operations across entities are common. Configure reasonable database connection limits and caching strategies to avoid service freezes or data inconsistency.

Reference only; verify against the target FastGPT release and deployment documentation.

How to Set Configurations

Configuration ItemRecommended ValueRationale
PG_URLjdbc:postgresql://[EIA approval system database address]:5432/epia_dbConnect to structured data from the national unified construction project EIA declaration and approval system to obtain basic project information and approval node data
STORAGE_S3_ENDPOINThttps://s3-cn-beijing.volces.com (can be replaced with government cloud object storage address)Store EIA declaration documents and approval materials, adapt to the upload and reading requirements of multi-source files
FILE_TOKEN_KEYRandomly generated 32-bit stringVerify the upload legitimacy of EIA files, prevent unauthorized files from accessing the review system
REDIS_URLredis://:[custom password]@[redis service address]:6379/0Cache classification tags and approval node status of EIA projects, reduce the pressure of repeated database queries
DB_MAX_LINK20–30Adapt to the connection number requirements for parallel retrieval of EIA data across multiple departments, avoid service interruptions caused by exhausted database connections
FE_DOMAINhttps://epia-review.your-gov-domain.cnConfigure the access domain name of the front-end service, adapt to deployment scenarios on government intranets or extranets

Three Common Misconfigurations

  • Phenomenon: A non-clickable overlay appears on the login page, and the front-end console reports a cross-origin error. Cause: The FE_DOMAIN parameter is not configured correctly, resulting in a mismatch between the front-end domain name and the back-end service domain name, and static resource loading is blocked.
  • Phenomenon: Calls to the EIA data interface return a 405 status code, and logs show that the remote WWW service supports TRACE requests. Cause: TRACE request support on the remote WWW service is not disabled, which does not meet the security compliance requirements of government systems and may be exploited by attackers.
  • Phenomenon: File parsing fails during batch import of EIA report forms. Cause: Parsing rules are only configured for environmental impact assessment reports, and no adaptation is made for the structured fields of report forms, resulting in failure to normally extract content from documents in unexpected formats.

How to Verify Successful Configuration

  • Call the database connection test interface to verify that the database connections configured via PG_URL and DB_MAX_LINK function normally, and can return basic field data of EIA projects.
  • Upload a standard EIA public participation statement document to verify that the FILE_TOKEN_KEY configuration takes effect, and the file can be stored normally in the configured object storage service.
  • Access the front-end domain name to verify that the FE_DOMAIN configuration is correct, and there are no abnormal overlays or cross-origin errors on the page.
  • Initiate a batch file parsing task to verify that the REDIS_URL configuration takes effect, and the parsing progress can be cached normally and displayed on the front-end page.

The values provided here are common starting points, and should be evaluated against the reader's own samples.

Question material comes from public community discussions. Configuration values are common starting points and should be measured against your own samples. Verified on 2026-09-28.